1.
As Ari MH, Aryanny E. Integrated Lean Warehousing Framework Reduces Lead Time in Raw Material Warehouse: Kerangka Kerja Lean Warehousing Terintegrasi untuk Mengurangi Lead Time pada Gudang Bahan Baku. acopen [Internet]. 2026 Feb. 24 [cited 2026 Feb. 28];11(1):10.21070/acopen.11.2026.13443. Available from: https://ojs.umsida.ac.id/index.php/acopen/article/view/13443