As Ari, M. Husin, and Enny Aryanny. “Integrated Lean Warehousing Framework Reduces Lead Time in Raw Material Warehouse: Kerangka Kerja Lean Warehousing Terintegrasi Untuk Mengurangi Lead Time Pada Gudang Bahan Baku”. Academia Open 11, no. 1 (February 24, 2026): 10.21070/acopen.11.2026.13443. Accessed February 28, 2026. https://ojs.umsida.ac.id/index.php/acopen/article/view/13443.