As Ari, M. H., and E. Aryanny. “Integrated Lean Warehousing Framework Reduces Lead Time in Raw Material Warehouse: Kerangka Kerja Lean Warehousing Terintegrasi Untuk Mengurangi Lead Time Pada Gudang Bahan Baku”. Academia Open, vol. 11, no. 1, Feb. 2026, p. 10.21070/acopen.11.2026.13443, doi:10.21070/acopen.11.2026.13443.