As Ari, M. H. and Aryanny, E. (2026) “Integrated Lean Warehousing Framework Reduces Lead Time in Raw Material Warehouse: Kerangka Kerja Lean Warehousing Terintegrasi untuk Mengurangi Lead Time pada Gudang Bahan Baku”, Academia Open, 11(1), p. 10.21070/acopen.11.2026.13443. doi: 10.21070/acopen.11.2026.13443.