As Ari, M. Husin, and Enny Aryanny. 2026. “Integrated Lean Warehousing Framework Reduces Lead Time in Raw Material Warehouse: Kerangka Kerja Lean Warehousing Terintegrasi Untuk Mengurangi Lead Time Pada Gudang Bahan Baku”. Academia Open 11 (1):10.21070/acopen.11.2026.13443. https://doi.org/10.21070/acopen.11.2026.13443.