As Ari, M. H., & Aryanny, E. (2026). Integrated Lean Warehousing Framework Reduces Lead Time in Raw Material Warehouse: Kerangka Kerja Lean Warehousing Terintegrasi untuk Mengurangi Lead Time pada Gudang Bahan Baku. Academia Open, 11(1), 10.21070/acopen.11.2026.13443. https://doi.org/10.21070/acopen.11.2026.13443