[1]
As Ari, M.H. and Aryanny, E. 2026. Integrated Lean Warehousing Framework Reduces Lead Time in Raw Material Warehouse: Kerangka Kerja Lean Warehousing Terintegrasi untuk Mengurangi Lead Time pada Gudang Bahan Baku. Academia Open. 11, 1 (Feb. 2026), 10.21070/acopen.11.2026.13443. DOI:https://doi.org/10.21070/acopen.11.2026.13443.