Perencanaan Sistem Pentanahan Tenaga Listrik Terintegrasi Pada Bangunan

DOI: https://doi.org/10.21070/jeee-u.v1i1.375

Author (s)


(1) * Jamaaluddin Jamaaluddin   (Fakultas Teknik universitas Muhammadiyah Sidoarjo)  
        Indonesia
(2)  Sumarno Sumarno   (Fakultas Teknik universitas Muhammadiyah Sidoarjo)  
        Indonesia
(*) Corresponding Author

Abstract


Abstract - Terms of reliability and security is an absolute thing required in conducting the design of installation of Power System. To obtain the reliability and safety of the use of Power on the Building there must be a good interconnection between Lightning System (Lightning System), Grounding of existing electronic devices in buildings and Grounding System Grounding (Grounding System) it. The interconnection of the three systems is carried out on a Bar Plate located in the Control Room, with a good security indication value and a reliable system if at the point of Bar Plate located in the Control Room has a value below 1 Ω. Using the Dwight formula in obtaining the earthing resistance value of the Electrical Power System on clay as an example shows the depth of Copper Rod 1 m has a value of 0.72 Ω. So by doing a good interconnection between Lightning Trap System (Lightnig System), Grounding Electronic Devices and Grounding System Power (Grounding System) in a building will get a reliable and safe Power System Power.



Keywords

Sistem Penangkap Petir; Pentanahan Peralatan Elektronik;Pentanahan Sistem Tenaga Listrik



Full Text: FullText PDF Indonesia



References


[1] Pabla, A.S. 1994. Sistem Distribusi Daya Listrik. Erlangga. Jakarta.

[2] Tadjuddin, 2000. Penerapan SistemGrid Tak Simetri pada Pentanahan Gardu Induk Bulukamba. Available at http www.elektroindonesia.com/ elektro. Diakses 26 Juni 2005.

[3] Badan Standarisasi Nasional (BSN), 2000, Persyaratan Umum Instalasi Listrik 2000 (PUIL 2000).

[4]Wahyono, Budhi Prasetiyo, 2013. ANALISA PENGARUH JARAK DAN KEDALAMAN TERHADAP NILAI TAHANAN PEMBUMIAN DENGAN 2 ELEKTRODA BATANG, Prosiding SNST ke-4 Tahun 2013 Fakultas Teknik Universitas Wahid Hasyim Semarang

[5]IEEE Standard 142, “IEEE Recommended Practice For Grounding Of Industrial And Comercial Power Sistem”, vol. 11,


Article View

Abstract views : 192 times | FullText PDF Indonesia files viewed : 351 times

Dimensions, PlumX, and Google Scholar Metrics

10.21070/jeee-u.v1i1.375


Refbacks

  • There are currently no refbacks.




Copyright (c) 2017 Journal of Electrical and Electronic Engineering-UMSIDA

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.